
ADTO News
-
Four Tips That You Cannot Ignore When Choosing the Ringlock Scaffolding
With the improving of the ringlock scaffolding market demand, so to stimulate the competition between the enterprise products, and some do not have small firms adopted some well-known large enterprise competition power is not the normal means of competition, the result is that many product quality problems, also give us the construction industry has brought the adverse social impact, how to choose better then ringlock scaffolding?Or listen to professionals in the following four considerations for analysis. A, whether the selection of steel pipe
2017-03-05 -
How to Promote Our Company Growth By Using Scaffolding Products
Scaffolding in the construction industry has played an important role in the development of, a lot of manufacturers scaffolding, both in the south and in the north have a lot of manufacturers, in the face of fierce competition so scaffolding manufacturer, how can we walk, in the front of the industry? Let under the ringlock type scaffolding manufacturer to us!
2017-03-02 -
How to Build the Scaffolding to Make it Moe Stable and Stronger
A, before installing the scaffolding hanging institutions need to do some preparatory work. Scaffolding leasing director suggested according to the shipping list box, counting the number of scaffolding parts components, check for damage to other retail parts, such as deformation anomalies. If there is any fault can be directly related to scaffolding leasing director for timely maintenance, to ensure that the scaffold of the initial mass. Correct installation, scaffolding hanging agencies. Scaffold quality head to remind in the process
2017-03-01 -
How To Dismantle the Scaffolding With Different Working Height
Scaffold below 10 meters high, can not consider weight factor, when up to 10 meters high above, an to consider self-respect. Such as scaffolding across 15 meters high, so, of poling extension should be staggered Settings, making poling long slot is not the same degree of surface, to ensure that the scaffold of d on the whole. On the construction personnel to fasten your seat belt, wear a good helmet, fully safe protection. In the process of dismantling d according to the top-down, after and take the first principles.
2017-02-28 -
Dismantle the Scaffolding In A Right Way to Save Time and labour
Demolished when the scaffolding to differentiate a d work area, set up fences around or set up the reference logo mark whatever logo symbol, on the ground must have the professional personnel command, strictly prohibited workers entered the work area. That is, to pull down the rail, scaffolding, brace, shears, then remove the small bar, bar and set lever, and so on, but also according to the principle of step dismantled, strictly prohibited from
2017-02-28 -
Scaffolding Accessories Shall Be With Strong Shear and Fine Structure
Scaffold structure accord with the requirement of the construction plan, change the size of the individual parts should be within the adjusting range of the permit; Node secure connection is reliable. Which the fastener tighten degree should be controlled in torsion moment 40 n. n. m ~ 60 m, where all welding quality should be reliable, embedded parts of embedding should comply with the design requirements, have sufficient strength, joint connection of wire rope should be reliable;
2017-02-27 -
What Are the Difference Between Different Kinds of Scaffolding Products
Activity of frame scaffold with trapezoidal scaffold is currently the most commonly used in the construction of two kinds of scaffold, trapezoidal scaffold is a new type of quick release scaffold, and some construction unit to accept new things slower still use frame scaffold. Trapezoidal scaffold is to solve the problem of previous door scaffold research and development of new type of scaffolding Scaffolding good overall performance: equipped with foot pedal, parallel to the frame, retaining
2017-02-27 -
Here Are the Right Ways to Build Tubular Scaffoldings in the Project
During the construction of a scaffolding, build links is the key link, is related to the scaffolding use safety. Construction personnel should strictly in accordance with the construction specification, simplify the construction process, avoid the empiricism. Below we will introduce the basic process of erection of steel pipe scaffolding: First, before the erection of steel pipe scaffolding, to inspect the steel pipes, fasteners and so on,
2017-02-26 -
How to Elongate The Working Time of Scaffolding in the Project
Building a scaffolding in the moment, as a kind of permanent multi-functional building construction tools equipment, the function of the contribution it, has played a tremendous value, but enlarge the use function of construction scaffolding, let it at the time of application is more safe and convenient, simple and flexible, is the one of another building scaffolding technology development trend. Along with the development of The Times, the scaffolding series of various
2017-02-26 -
What Are the Difference Between Longitudinal Tube and Welded Pipe
1. The carbon fiber tube memory ability is very good, will restore the original state after bending, sporting goods are widely used. 2. If the impact force is enough, the carbon fiber will be torn apart, it is used in car shell, torn crash energy absorption and protection of the car. So, you need to tube, depends on the intensity of demand to design. 3. The hole in the carbon fiber tube won't appear problem, once have the damage, will be
2017-02-23 -
How to Protect and Maintain the Scaffolding Scaffolding tube in Daily Work
Maintenance: After the completion of construction, convened by the head of construction technology, safety and the erection team personnel, carry torque wrench, appearance and actual inspection. 48 mm half inches pipe maintenance: 1 even wall fastening and displacement of reinforced bar. Affecting the construction of the site, measures should be formulated in the technology sector, may shift change effort, the operator shall not, without even the wall displacement of bar.
2017-02-23 -
The Connection Between Scaffolding Parts Shall Be Stable
Top mobile scaffolding foundation must be strong, before the erection of the computation, meet the requirement of load, and set-up, and according to the construction of drainage measures. Top mobile scaffolding must attach great importance to all kinds of structural measures: bridging, node, etc. Shall be set up according to the requirement. Level is closed: should be the first step, every step or two step, be put with scaffolding plank hand or foot basketry, scaffolding to laid
2017-02-22 -
The Size of Scaffolding Shall Be Designed With Great Care
Sweeping bar is missing, not connected, sweep the floor two vertical and horizontal bar from the distance is too big or too small, etc.; Scaffold board list, insufficient thickness, overlap does not meet specification requirements; Large formwork dismantling thick inside not for network between rod and wall body; scaffolding tube bracing in plane not continuous; Open the scaffold not brace; Scaffold board under the small bar spacing is too large; Even the inside and outside
2017-02-22 -
How to Use the Ringlock Scaffolding to Its Full Play and Advantages
New ringlock scaffold is effect on the ground, rely on the ground to power, prevent a collapse. Second is when installing new wheel button scaffolding need to develop a more complete and clear design, must have a clear understanding, before installation to ensure overall has good resistance performance and stable performance. Finally notice that after the installation is complete, to increase the bracing enough, at the top of the frame body can be 300 to 500 mm or
2017-02-22 -
The Ringlock Scaffolding Winning Prize Because of Its Quality
Processing ringlock scaffolding company provides low price and supplies wholesale, cut down material, to do with the split with the shipment, to avoid the phenomenon of missing parts. Use the rope bind components, high need to use a pulley to slow down to it, random dumping is prohibited. Again the material shipped by specialized personnel in the designated place, classified storage. Pay particular attention to round buckle properly kept of scaffold of some small parts.
2017-02-22