What Measures Shall Be Made Before the Installation of Ringlock Scaffolding
At the beginning of the buildings built, we often see some support for the construction of the high-rise buildings, the periphery of the shape of these stents through careful observation, it is not hard to see its type, is generally common scaffolding is ringlock scaffolding. The scaffold installation is simple, but there are some preparation work to do, the following is the introduction to the preparatory work, hope these can help you.
First of all, the early stage of the construction to determine the location of the installation, and line on the positioning, ensure that later in the installation process makes it perpendicular to the ground.
Second, must ensure that the position of the robustness of the ground, the best tamping on the ground, and this work is to prepare for the stability of the scaffold installation.
Third, the use of the specifications of the scaffold must be consistent.
Fourth, to get all materials ready in advance, construction personnel in place ahead of schedule, so that we can improve the work efficiency of installation.
Finally, earnestly do a good job in construction to ensure that the ringlock scaffolding connection is very strong, in the life safety of the personnel working on a scaffold. In the process of using, the prophase work is important, that is to be made in advance system of special construction plan design, the contractor unit alignment positioning, make the horizontal flat vertical support system, to ensure the overall stability and resistance to capsize;
Installation is to consolidate the basis of formation and take concrete hardening measures; In the use of the entire process, structures, more secure, the high standard, should be within the scope of the standard, set up after the completion of security checks, ensure the safety of the construction.