How To Test Pipe Fitting?

Time:2019/11/01

 

Pipe Fitting Inspection & Testing

 

During the manufacturing various Inspection & Testing are carried out on pipe fitting to ensure the quality of the product.

 

Hydrotest for Pipe Fittings

#1 Hydrostatic Test Not required for pipe fittings unless specifically requested by the purchaser.

#2 Code mandate that fittings shall be able to withstand under pressure required by applicable Piping Code.

#3 Most purchasers mandate, that a hydro tested pipe shell be used to manufacture fittings.

 

Brust Test Proof Test

#1 To qualified the design of the pipe fitting, the manufacturer performed various tests including a burst test to ensure that design will meet all the standard & code requirements. In this test, a pipe & fittings are welded and a dummy pipe spool is prepared. This pipe spool is then pressurized to pre-define calculated burst test pressure. If the fittings withstand the test, all the future products manufactured using that design will consider safe to use.   

#2 Lap joint stub ends are exempt from the proof test because they are used with flange assembly and design considering applicable pressure-temperature ratings.

 

Non-Destructive testing

Based on the type of fittings any of the following Non-Destructive testings are performed on finished fittings to ensure the soundness of the product.

#1 Ultrasonic

#2 Radiography (Only for Weld)

#3 Magnetic particle test

#4 Liquid penetrant test

#5 And Positive Material Identification

 

Destructive Testing

Destructive Testings are performed to check the strength of the body and weld of the product.

#1 The proof test is also known as type test or burst test.

#2 Tensile test

#3 Impact test / Charpy V-Notch Test

#4 Hardness test

 

Metallurgical Tests

Metallurgical Tests are performed on fittings body and weld to confirm standard requirements

#1 Micro Analysis or Chemical Analysis of

#2 Raw material

#3 Product

#4 Weld

#5 Macro Analysis

#6 Weld

 

Special Tests

Special tests are carried out on fittings to confirm its ability to withstand in corrosive environments. These tests are: 

#1 IGC- Intergranular Corrosion Test(SS)

#2 Ferrite (SS)

#3 HIC- Hydrogen-induced Cracking

#4 And SSC- Sulfide Stress Corrosion Cracking

#5 Grain size (AS & SS) of material are checked to confirm microstructure

 

VISUAL INSPECTION

Visual Inspection is conducted on fittings to check any surface imperfections. Both fittings body and weld are checked for any visible surface imperfections such as dents, die marks, porosity, undercuts, etc. Acceptance as per applicable standard.

 

 