WHOLE SCAFFOLDING & FORMWORK SYSTEM (DESIGN) SERVICE SUPPLIER!

update
> ADTO News > What other advantages can you get from the ringlock scaffolding

Why Can the Ringlock Scaffolding Save Your Time And Energy

Time:2017/07/10

All kinds of ringlock scaffolding, steel ringlock scaffolding, scaffolding accessories products, all products comply with the corresponding production standards, quality reliable, guarantee can satisfy the using demand of the customers.

 

 

 

 

ringlock scaffolding

 

Ringlock scaffold quick assembly, operation bento, save cost, with less dosage, light weight, operators can double local assembling. Take down the fee, freight, rent and maintenance fee accordingly to save city, general environment can save 30%.Ringlock scaffold can better save cost, higher efficiency, of course ringlock scaffold system from the point of one-time procurement costs, than ordinary steel pipe fastener scaffold is high, but from the long run, the actual average annual cost is much lower.

 

Concrete from the following two aspects to analysis. Number of bars. The adoption of Q345 grade steel stud, intensity is higher, the spacing between bars can be bigger, up to 2 m. Thus a reduction in the number of the stud, so as to achieve the goal of reducing cost. Operating time.

 

Due to profile bar is the hot dip galvanized freedom, which has a longer durability, operating life can reach more than 15 years, does not require constant maintenance and maintenance once every 3-5 years. And ordinary steel pipe scaffold general operating life only at the mercy of 5 to 8 years, and safeguard required 1-2 times a year. It is obvious that the traditional scaffold maintenance costs than the ringlock scaffold maintenance costs more.

 

 

 

 

ringlock scaffolding

 

 

 


Ringlock is mounted ringlock scaffolding set-up requirements: operating ringlock scaffolding, double exclusive scaffolding, height is not more than 24 m, more than 24 m, required in addition to design object. User can choose according to the operation requirements frame body geometry size, the degree of adjacent pole step 2 m, appropriate chooses and poling longitudinal spacing should be 1.5 m or 1.8 m, and should not be more than 2.1 m, poling horizontal spacing should be 0.9 m or 0.9 m. 

Related News