ADTO News
Normal Regulations of the Erection and Removal of Ringlock Scaffolding
1. Work must wear a helmet, high-altitude operations must be a good seat belt, is strictly prohibited drunk.
2. Ringlock scaffolding erection must be in strict accordance with the "construction and installation workers safety technology operating procedures" and the construction program requirements, ringlock scaffolding must be solid and reliable or not construction.
3. take, remove the ringlock scaffolding, we must pay attention to the construction site of electricity, such as distribution boxes, cables, external lines, etc., is strictly prohibited littering, to prevent electric shock or hurt others.
4. Scaffold board to be covered, tied, no probe plate, and to be firmly fixed on the support of the ringlock scaffolding, ringlock scaffolding of any part of the template must not be linked to the scaffold should be two from the inside out in the order, When the first piece of the shop or turned to the outermost footboard, you must hang the seat belt.
5. Ringlock scaffolding on the outside, chute and platform, to tie a 1-meter-high protective railings and nails 18 cm high foot or protective legislation network, laying safety facilities should always check to ensure that operators and small machinery safe passage.
6. Ringlock scaffolding on the materials and tools to be stacked neatly, snow and debris should be promptly removed. There is a slope of the scaffold, to add anti-slip wood.
7. In the hole to take the pick (outstretched ringlock scaffolding), diagonal and the bridge is generally not more than 30 degrees, and should be supported in the building of a solid part of the pick all the points to be tied double hook, railing.
8. Erected in the water ringlock scaffolding, should always check the force of the situation, found loose, deformation or subsidence should be promptly reinforced. In the ringlock scaffolding operators should be equipped with life-saving equipment.