ADTO News
-
The momentum of the formwork system in construction projects.
On the promotion meeting of the techniques for the Chinese international formwork scaffolding in 2015, the relevant personnel
2015-11-06 -
Tips for How to Erect the Scaffolding in a Safe Way
When erecting the high rise or multi-leveled buildings, there shall be composed of the special construction plan and for the erecting height over 50m
2015-11-06 -
The fundamental erection requirements of the stadium tubular scaffolding.
General requirements: The erection height of the scaffolding for sale shall be one lift higher than the working platform and form a closure
2015-11-05 -
The construction plan of the tubular scaffolding in the stadium.
In this construction building, the height from the web frame to the surface of the building is 8.3m and the installation
2015-11-05 -
How to choose the erection plan of the different scaffolding?
When choosing the erection plan, the following elements shall be taken into consideration: The structural design of the scaffolding for sale frame shall meet the requirement on the
2015-11-04 -
Requirements on how to build the steel structure scaffolding.
Construction arrangement: The steel tubes used in the project are with the size of 48*3.5 and the erection height shall be lower than 24m.
2015-11-04 -
The construction plan for the steel structure movable scaffolding.
Preparations: Testing and accepting the steel tubes, the groove steels, the couplers, the scaffolding planks
2015-11-03 -
What are the working process for the erection of the scaffolding?
When building the scaffolding frames, the ground shall be leveled and solid and the bottom of the standing tubes shall be backed
2015-11-03 -
The Comparison between Frame Scaffolding and Tubular Scaffolding
The differences between Frame Scaffolding and Tubular Scaffolding can be compared as follows
2015-11-02 -
How to solve the problems occurred in the construction process?
Some application problems can’t be avoided as there are always some mistakes in processing of the construction
2015-11-02 -
Application of frame scaffoldings in the subway project.
The frame scaffolding are firstly used in the frame projects in the subway and express high way. With the wide spread application of the frame scaffolding around the country
2015-10-30 -
Requirements on how to secure scaffolding safety and reliability.
When removing the scaffoldings, line out the working area and set up fence or warning marks around the area.
2015-10-30 -
Requirements of the scaffolding in the comprehensive building construction.
The floor type scaffolding frames. The steel tubes for the floor type scaffolding shall be 48mm in the outside diameter and 3.5mm in the wall thickness.
2015-10-29 -
Erection of scaffolding elements in the construction projects.
Scaffolding pipe steel 1.The external diameter of the scaffolding pipe steel is 48mm
2015-10-29 -
How does the cantilevered scaffolding work in the construction?
The cantilevered scaffolding makes use of the protruding cantilevered structure of the construction buildings
2015-10-28