What You Need Pay Attention to When You Remove Scaffolding
After the construction completion, through engineering, head of the check and confirm that no longer need to use the scaffold can be dismantled. Dismantle scaffolding to make plan first, then after engineering director for approval can be removed. What attention scaffolding demolition should pay to?
The dismantled scaffold must meet the following requirements when a before, dismantle scaffold, must first remove the scaffold material above, construction tools and all kinds of stuff. Second, follow the principle of loading first open after demolition order, demolition of 1 in the following order, first at the edge of the across the top of the armrest and baluster, then dismantle scaffold and escalators, and unload level pole and bridging.2, from the top of cross-border began tearing down the cross, and then remove the bar at the top of the wall and door frame.3, to dismantle the door frame and accessories.
Door of the free cantilever scaffold height can't more than three steps, otherwise will be temporary Rachel.4, and then continue to break down. Even the wall pieces, such as rod, scissors, long horizontal must first remove the related after across the door can be removed.5, then removed sweeping bar, the bottom door frame and sealing bar. Six, the last base, plate, plate.
Scaffolding must comply with the following security requirements: 1, workers must stand on the temporary scaffolding demolished.2 and dismantling scaffolding, banned use hammer banging at disassembly. While storing them, we must have a clean, dry and no pollution environment, this is let them have good performance, and can be used for a long time and guarantee the best conditions.There are, of course, must be far away from flammable and explosive substances, etc.