1. The build-up of high-level scaffolding planks, adopted by all needs to fit a variety of data quality requirements.
2. Must be strong, high-level scaffolding foundation before the erection of the calculation satisfies the requirement of load, and according to the construction standard build-up, completes the drainage measures.
3. Scaffolding, technical requirements should fit the standard rules.
4. Must highly pay attention to all kinds of structural measures: bridging, node, etc. Shall be set up according to the requirement.
5. The degree of blockade: should be the first step, every step or two steps, be put with scaffolding plank hand or foot basketry, scaffolding to laid along, the joint stack should be placed in a small bar, it is forbidden to appear shortboard. And between the stud and metope in every step four series as long bottom basketry up the scaffolding planks is safe and sound.
6. Vertical blockade: from the second to fifth step, each step all needs to the stud unavoidably side set up in 1.00 m high protective railings and pedal or set up network, protective pole (network) and vertical pole pin down; Step 5 above in addition to the set a guard rail, should be all set, basketry or peace set net; In concentration areas or residents along the street, it should be the second step, the outside all set, basketry or peace set net.
7. Scaffolding planks should be higher than the top of the building material or operating surface more than 1.5 m and added a palisade.