Cuplock type steel pipe scaffold made by steel tube pole, cross bar, bowl joint, etc. The basic construction and erection requirements are similar to the fastener type steel pipe scaffold.

 

scaffolding

 

 

The bowl set into the stud. Rail welding and diagonal plug. When assembling, the difference lies mainly in cuplock joint. Cuplock joint by joint on button bowl, the bowl, bar and the bowl on the limit pin, etc.

 

Stud welding on the limit pin buckle bowl and the bowl. Will cross bar and the inclined rod inserted into the bowl, pressure and rotating bowl, using the limit pin is fixed on the bowl.


Cuplock type steel pipe scaffold column vertical horizontal distance of 1.2 m distance according to the scaffolding load can be 1.2m 1.5m 1.8m 2.4 interval of 1.8m 2.4 m build-up of poling extension should be staggered. Up 3.0 m long pole, the first layer poling a length of 1.8 m and 3.0 m poling staggered arrangement. To the top with a length of 1.8 m and 3.0 m two leveling. High 30 m below the scaffolding verticality deviation should be controlled within 1/200, more than 30 m high scaffolding should be controlled in 1/400 ~ 1/600 of the total high verticality deviation should be no greater than 100 mm

 

scaffolding

 

There are many kinds of scaffolding you said that one of them. Rare are:


For the construction and erection of feeding, feed and construction of temporary structures. One end of the lateral horizontal pole shelve the scaffold on the wall. Single row scaffolding (single) only a row of stud. Double-row scaffold (double bent) stands by two rows of inside and outside the scaffold pole and horizontal pole, etc.
 