ADTO News
Strengthen The Scaffolding Coupler Use Management
1. When setting up the scaffold, the construction shall be carried out strictly in accordance with the relevant provisions of the safety technical specification of construction and steel pipe scaffolds and the relevant provisions of the municipal commission of construction; When conducting the safety technology, the frame foreman should demonstrate the torque of the fastening of the fastening bolts to the method of 40-65n. M, and give each operator the experience and mastery; When the scaffold is accepted, torque wrench must be used to tighten the bolt Force check.
2, according to the ministry of construction, the greater danger project safe special construction plan establishment and expert proof examination method "regulation, the greater danger engineering standard height, span and load bearing scaffold engineering, construction units should be combined with engineering characteristics, writing special construction plan, achieve the" five ", which has special construction plan, design, calculation, disclosure and acceptance. In the case of the negative deviation of the steel pipe size in the allowable range, according to the actual dimensions of the steel tube, the expert should be proved and approved strictly according to the procedure.
3, to the scene has been the erection of scaffolding, according to the actual circumstances of the frame body, led by the technical department to analyze the frame body, put forward the frame body reinforcement or other security measures, and organize their implementation.
4. The security departments of each unit should strengthen the daily management and inspection of the use of scaffolds, timely detect hidden dangers and immediately rectification; Those who fail to meet the quality problems or fail to meet the standards shall be ordered to retire.
5. The test of the steel pipe and the fastener shall be used without the relevant requirements of this regulation; Not according to "construction scaffolding coupler type steel pipe scaffold safety technical specifications" and the city is built appoint, and the relevant provisions of the group companies or for erection of scaffolding construction units and head, will be based on the group "production safety penalty" carry on punishment or in a group, a local area network exposure, if the circumstances are serious will be ordered to cease to rectify, until the relevant leadership responsibilities are investigated.