WHOLE SCAFFOLDING & FORMWORK SYSTEM (DESIGN) SERVICE SUPPLIER!

update
> ADTO News > What other advantages can you get from the ringlock scaffolding

Standard Mobile Scaffolding Manufacture Providing Qualified Scaffolding Products

Time:2016/11/27

Mobile scaffolding is introduced: the ratio of quality and application. According to the user and data reflect both at home and abroad, frame of door type, such as maintenance good, reusable above 30 times, bamboo and wood frame is can't match. Mobile scaffolding using weight per unit area was 50% lower than the rate for fastener type steel tube frame, every time down the consumption cost is half of the steel frame, is the 1/3 of bamboo and wood frame, efficiency and benefit is remarkable, and buildings as cost-effective as possible.

 

 

scaffolding for sale

 

 

 

From the formwork used mobile scaffold materials, the composite steel formwork amortization cost low, good economy; Element face wood plywood amortized cost is high, due to low turnover, not only poses a great consumption of timber resources and waste, and the amortization expenses 3 ~ 6 times higher than the steel mold, economical efficiency. From the mobile scaffolding category formwork tool type formwork product formwork panel material than now, now, now, now break the traditional construction formwork amortization cost is low, simple to use, easy to make.

 

Amortization of premium formwork than low-quality cheap formwork fee is low, durable, high turnover formwork product than poor quality, low consumption, turns formwork amortized cost is low, but a one-time investment, therefore, premium tools type formwork product should dominate the development of leasing, in order to give full play to their potential.

 

 

 

scaffolding

 


There are a lot of construction site technical directors, there is no technical disclosure, the safety of the operators in detail with some workers quality is poorer, unavoidably application problems. If some formwork collapse is due to the operating workers did not according to the design requirements set shear brace or vertical and horizontal tie spacing, can cause mould frame stability; Some accidents are workers to dismantle scaffold outside the connection between the building and the pull rod, the overall collapse led to the scaffold.

Related News