1, regularly remove accumulated in the scaffolding tube pipe shelf dangerous parts of the materials, brick, concrete block and sundry; And on the shelves on the tube material should have certain limit, can't overload piled up.

 

 

 

scaffolding tube

 

 


2, along with the observe frame tube structure of the whole or local whether there is any deviation, especially the frame tube of each joint is to loosen deflection phenomenon, such as they should be should be timely maintenance.
3, check the net twine federated eye network root bundle loosening and mat bamboo basketry and covered with bamboo basketry colligation point for hamstring off wait for a phenomenon, if found fracture, loose, etc., should be timely change.
This section of the scaffolding tube rack pipe maintenance skills.


1. Observe the scaffold whole or partial vertical deviation, especially in observation scaffolding corners, breaking in two side port, whether the deflection, sinking as found a strange person, shall immediately organize personnel for reinforcement.
2. Regularly check mat bamboo basketry, timely repair hamstring breaks, fill the hole. And at the same time check the colligation point of bamboo basketry.


3. Even the wall fastening and displacement of reinforced bar. Affecting the construction of the site, measures should be formulated in the technology sector, may shift change effort, the operator shall not, without even the wall displacement of bar.
4. Check carefully whether the federated network root bundle loosening, whether the net twine breakage, found loose timely recovery, finding a breaking change in time.

 

 

scaffolding tube

 

 

 


5. Remove accumulated in scaffold materials, brick, concrete block dangerous parts of the clutter.
6. Supervise pile by using personnel material, make it no more than the construction load. GI Scaffolding pipe for masonry, pile of bricks, for example: three layer below the line standard brick, porous brick four layer below the line.