Safe Technology Measures of Working on the Scaffolding System

Time:2016/08/03

1 outside frame scaffolding each take a layer structure, pitched to end, the project department safety personnel qualified rear can use. No supervisors and individual shall not be arbitrarily dismantled scaffold parts without permission.
2. strictly control the construction load scaffolding shall not focus stacking load, construction load shall not be greater than 3 kn / ㎡, ensuring the safety of large reserves.

 

frame scaffolding

 


3 structure construction does not allow multilayer homework at the same time, when decorate construction at the same time the number of layers to be no more than two layers, the temporary use of cantilever rack at the same time operating layer number is less than 1.

4 below even higher when the job layer wall pieces more than 3.6 m, and there is no wall piece, with temporary support should take appropriate measures.

5 layer set up reliable protective barrier between each activity, to prevent falling objects.

6 regularly check the scaffold, find problems and hidden dangers, timely maintenance before construction work, in order to achieve strong stability, ensure construction safety.
ADTO's frame scaffolding three advantages:

1, the provincial artificial: one hammer to install, set up removal efficiency increased by three hundred percent
2, material: steel consumption is only seventy-two percent of that in the bowl system disk system
3, save money, reduce material cost, labor, management fees, loss reduction, save maintenance cost, service life for 15 years.

 


frame scaffolding

 


4, security: steel ring, disc, cast steel head, bolt and other accessories, in strict accordance with the AQL inspection standard false without welding, welding, so welding, welding slag, burr.
Brief introduction: ADTO group has four production bases, a total area of 300000 square meters, 4 disc scaffolding production line, annual production capacity of 60000 tons ADTO group is partner with China's nuclear power corporation, China railway group, China heavy industry, China in turbine, China building, Sinopec.

Related News