Performance Comparison of Aluminum Formwork and Wooden Formwork

Time:2019/11/20

 

For your better understanding of the performance difference of aluminum formwork and wooden formwork, we made a list as follows.

 

 No.

Items

Aluminum Formwork

Wooden Formwork

1

Materials

4.0mm Aluminum Plate

15mm Laminated Plywood

2

Template Thickness(mm)

65mm

15mm

3

Weight(kg/m2)

21~25kg/m2

10.5kg/m2

4

Bearing Capacity(KN/ m2)

30~50KN/ m2

30KN/ m2

5

Construction Period

4~5 Days

5~7 Days

6

Construction Difficulty

Easy

Difficult

7

Maintenance Charge

Low

High

8

Construction Efficiency

High

Low

9

Range of Application

Wall, Pillar, Beam, Panel

Foundation, Wall Column, Beam, Panel

10

Surface Quality of Concrete

Smooth and Clean, Meet the Finishing and Decoration Requirements.

Rough Surface

11

The overall quality of Concrete

No Deformation, High Accuracy of Horizontal Perpendicularity

Mold Deformation, Large Deviation of Horizontal Perpendicularity

12

Windows and Doors Holes Installment

High Accuracy, Can be installed from bottom to top without leveling point.

Large deviation, outdoor plaster is needed to install.

13

Hoisting Machine

No

Yes

14

External Shelf Requirement

Low

High

15

Mortar Leakage Situation

No Mortar Leakage, no require for cleaning

Mortar leakage, need for cleaning

16

On-site Garbage Cleaning Cost

Low

High

17

Cost on Engineering Change

High

Low

18

Technical requirements for concrete pouring and reinforcement

High

Low

19

Construction Personnel Requirements

Medium technological requirements required fewer people.

High technical requirements, required for more people.

20

Formwork Removal Conditions

The plate can be removed first, then remove the support. Interchangeable Operation is available

All the formwork should be removed before entering the next work

21

Site Safety and Sanitation after Formwork Removal

No cement mud, No scrap nail, Ensure the safety and sanitation of the construction site.

Lots of cement mud, scrap nails and such kinds of garbage. There are safety hazards on the construction site.

22

Construction Decoration Project Cost

No require for indoor and outdoor leveling and plastering fee

Require for indoor and outdoor leveling and plastering fee

aluminum formwork on construction site