WHOLE SCAFFOLDING & FORMWORK SYSTEM (DESIGN) SERVICE SUPPLIER!

update
> ADTO News > What other advantages can you get from the ringlock scaffolding

Application Analysis of Building Formwork Construction Technology (4)

Time:2019/11/20

 

Effective measures to solve the main problems in the construction process of building formwork.

 

#1 Strengthening technical management before construction

The construction of the formwork structure involves various construction links, therefore, it is not only necessary to use the formwork design drawing as the standard, but also to combine the overall construction process design drawings to ensure that the formwork configuration is in line with the overall construction requirements. At the same time, it is necessary to check the specification model, size and shape of the template to ensure the scientific and rational internal structure, which is also a key point to ensure the stability and reliability of the building.

 

In the case of conditions, the precision calculation instrument should be used to measure the bearing load force, the weight and the pressure it brings, and simulate the effect of the formwork structure to ensure the scientific design. And reasonableness. Avoid temporary changes to the formwork construction process due to imperfections in the design, resulting in a large amount of labor cost loss and cost waste.

Related News