What are the Difference Between Single Row and Integrated Scaffolding
When the building of scaffolding outside the building facade along the line erection height is less than 15m, calculated as a single row of scaffolding; higher than 15m, calculated as a consolidated scaffolding.
2016-06-07 -
Construction Cases of Hanging Basket Scaffolding Project
1, the inside of the building from the gondola gap 100-200mm, the gap between the two basket shall not exceed 200mm. The maximum length of the basket should not exceed 8m, the maximum length can not exceed homemade basket 6m, width 0.8-1.2 m, height is generally not more than two. Special needs should be specifically designed, each floor height does not exceed
2016-06-06 -
Space Between Scaffolding Tubes and Bridging Braces Erection Standards
1, pole, long bar, to meet the short rail and other construction related specification and program requirements. When the case of the door need to increase the spacing specification the strength should be reinforced. 2, as a scaffolding pole main force bar, set the spacing should be uniform, non-spacing increase, otherwise it will reduce the carrying capacity of the stem; long-distance rail step change will also
2016-06-06 -
What are the Four Advantages of Ringlock Scaffolding System
One functional full-wide application Ringlock Scaffold uniform distance 500mm disc, with its oblique support pole and horizontal bars, can be installed at different compositions and different sections span bridge support, stage support, lighting towers, bridges, piers safety ladder, traditional bridge support mold system cumbersome and only apply to a specific size, significant limitations, you can install ringlock scaffold composed of different functions in different shapes template holder to set up to meet the needs of various styles.
2016-06-03 -
What are the Requirements to Build Scaffolding in Hydroelectric Projects
This section is a general safety technical requirements for scaffolding, see the rest of the relevant provisions "scaffolders safety technology regulation." Conventional two load scaffold must not exceed 2.7Pa, after scaffolding barricaded, subject to the construction and use of acceptance inspection department, are allowed to use. Three special scaffolding parts used must be approved by the person in charge of design and technology, and only technical tests after the erection and use.
2016-06-03 -
How to Assure the Safety of Steel Tubular Scaffolding System
According to the engineering characteristics: double steel scaffolding building pitch control stand about 30cm. We must meet the construction schedule. Erection once a height above the operating level step frame. Pole row spacing of not more than 2m, spacing 1.2m, on backgammon as 1.8m. Bottom steel pole must be connected to different lengths staggered position, the connection point of adjacent pole should not be at the same height. In addition to
2016-06-02 -
How to Install the Supporting Scaffolding Tube in the Whole System
Spacing bars embedded short distance on the same supporting truss. Under short reinforcement embedded node spacing position to support truss pitch twice, both intervals. Wall junction node should have sufficient strength, the strength of concrete anchor at no less than 15MPa. Buttresses supporting truss rail and pull one end of the pole should be drilled Φ14 perforations, the embedded directly into the sleeve of short bars then bent rebar exposed parts to prevent
2016-06-02 -
Do You Know How to build Scaffolding Outside the Bank
(1) erection principles: smooth vertical and horizontal with safe, reliable protection. (2) scaffolding erection tolerances shall meet the relevant requirements. (3) Every scissors across a width of 4 3-step, bridging between spaced not more than 15m. (4) pull contacts every step in the vertical direction, the horizontal spacing of three to four pole set up. (5) of each rod erection a, erection pole: the bottom of the pole spacing using
2016-06-01 -
How to Dismantle Scaffolding System Outside Suite Buildings
1, erection site of scaffolding should be flat, and there shall be provision of drainage measures (drainage ditch). Scaffolding poles are at the necessary solid floor. Stand at the bottom of the land surface of the pole should be reinforced, specific methods are: prime soil compaction, shop 100 kind of slag, pole underlying channel 12 or 50mm thick planks. 2, before the erection of the first discharge line for construction, erection of
2016-06-01 -
The Difference Between Single and Double Line Scaffolding
Steel material used in the production of Chinese now have a steel tubular scaffolding, steel scaffolding ringlock, socket type steel scaffolding, gantry scaffolding, and there is a variety of scaffolding, hanging scaffolding pipes and other materials pick scaffold. Its material and construction proceeds with the case, which can be roughly divided as follows:
2016-05-31 -
What are the Scaffolding Types and Their Functions
At present, many projects require high-altitude operations, and scaffolding role is particularly important. Scaffolding is a temporary construction essential facilities, such as turn masonry walls, pouring concrete, wall plaster, stucco decoration and installation of structural members, would require the erection of scaffolding next to it, in order to stand on top of the construction operation, the level of short-distance transport and construction materials stacked when necessary.
2016-05-31 -
How to Make Sure the Building of Scaffolding Tube is Safe
According to the engineering characteristics: double steel scaffolding building pitch control stand about 30cm. We must meet the construction schedule. Erection once a height above the operating level step frame. Pole row spacing of no more than 2m, spacing 1.2m, on backgammon as 1.8m. Bottom steel pole must be connected to different lengths and staggered position, the connection point of adjacent pole should not be at the same height. In addition to the use of lap top pole connector connection, the rest must be docking fastener connection, lap length not less than 1m. The first root vertical pole shall be temporarily located across every 6 a and the ground was 45 ° ~ 60 ° the bracing.
2016-05-30 -
Do You Know Construction Material of Steel Tubular Scaffolding
1) selection of φ48.3 × 3.6mm steel pipe, steel pipe thinnest wall thickness is not less than 3.24mm (should not seriously corroded, bent, crushed or crack); old steel surface corrosion depth should follow the "construction of steel tubular scaffold safety specifications "JGJ130-2011 provisions. To severe corrosion of steel drawn, three in each of the corrosion of the worst parts laterally truncated sampling check shall not be used corrosion depth exceeding a predetermined value.
2016-05-30 -
User Manual of Steel Tubular Scaffolding Product
Before the erection of scaffolding, it is necessary to rack tube, fasteners, bamboo, wire inspection, pipe rack severe bending, fastening severe erosion, crack, rot raft necessary scrapped shall not be used. The channel and the escalator at heightening reinforcement scaffolding bar should not obstruct passage. Planks and boards for a paved ramp to the rack rails. When the mobile scaffolding rental scaffolding when all the staff necessary for the scaffolding down, it was prohibited to move above
2016-05-27 -
Supporting Frame Types in the Scaffolding System
Frame Scaffolding erection of various types of material can support frame templates, including beam mode, formwork, slab mold and mold base box, etc., and is used extensively for Beam template holder. In the mold slab formwork and scaffold, support height> 4.0m, known as "high-carriage", the early dismantling requirements and device are known as "early brace formwork system support frame." Type fastener, bowls button and scaffoldings with steel materials can be used to construct the
2016-05-27