Erection of Scaffolding Requirements and Matters Needing Attention
Erection of scaffolding requirements and matters needing attention are as follows: 1. The erection of scaffolding general requirements (1) the construction personnel must wear safety helmet when working on the shelf, fasten your seat belt, wear soft shoes. Scaffold materials should be piled up smoothly, construction tools should be placed within the tool bag, passing objects without throwing up and down.
2017-05-15 -
The Construction of Scaffolding Has Such Requirements on the Materials As Follows
1. Fasteners warranty information should be complete, enter the site shall be carried out after sampling the second interview, technical performance shall comply with the terms of the steel pipe scaffold fastener GB15831, before use should be selected individually, have crack, deformation, bolt slide wire is strictly prohibited. 2. The welded pipe diameter should be 48-51 mm, wall thickness 3-3.5 mm, length to 4-6.5-2.8 m and 2.1 m advisable, severe corrosion, bending, crack, damage may not be used.
2017-05-14 -
How to Manage the Scaffolding Accessories in the Construction Project
Strengthen the safety management of scaffolding, scaffolding steel pipe must be carried out in accordance with the plan calls for the erection, three-step test, and the acceptance of qualified rear can use brand, dismantled scaffold should set up the warning line, prohibit no official inside, dismantling sequence should be top-down, not up and down operation at the same time, the demolition of the materials should be passed on or handed out from the doors and Windows, prohibit throw down.
2017-05-14 -
What Problems Will Occur During the Use of Scaffolding Tube
Path of steel prices rebound at the end of last month's immediate death, start the steel from the raw material market shelf obviously does not have continuity; May Day after frame tube, steel price originally want to borrow continued upside apparently failed to achieve the purpose of the study, in the downstream demand is not willing to support the case, return to weak shock interval, the market steady dark drop shipping operation more and more. Even under the led of
2017-05-11 -
How to Judge the Quality of Scaffolding Tube Used in the Project
Nowadays more and more scaffolding tube to use occasions, along with the increase of the manufacturer in a lot of fake and shoddy products began to gradually into the market, or some manufacturer the sham as the genuine quality low scaffolding as a high quality product to sell, shun surplus mobile scaffolding to produce manufacturer to tell you how to identify the quality of the mobile, a professor at the frame. See crack glaze, scaffold tube appear crack glaze is a common phenomenon, inferior scaffolding
2017-05-11 -
What Are the Reasons to Cause the Scratch of Scaffolding Tube
High-frequency welded scaffolding tube welding speed, welding heat affected zone is small, also don't need to clean up before welding, more convenient, so widely promoted. High frequency welded scaffolding tube scratch is mainly caused by guide roller and the squeezing roller. Caused by high frequency welding squeezing roller scratch mainly occurs at the bottom of the steel scaffolding tube, the reason to roughly three, high-frequency house can for detail below.
2017-05-10 -
What Are the Building Steps for the Insulated Scaffolding Tubes
1. The overall structure uses the modular design, to build simple and easy to remove. 2. Standard parts, do not need to use any tools, unarmed can tear open outfit, simple and convenient. 3. The combination of diversity, can adapt to any site environment, can be customized according to customer's requirements. 4. Material uses light high-strength fiberglass scaffolding tube, 15 years without maintenance. 5. The product conforms to GB17620-1998 "live working with insulation gangway general technical conditions" and through the national authoritative department detection, good user response.
2017-05-09 -
How to Building the Scaffolding Tube in the Ringlock Scaffolding in the Project
1, multi-function. According to the specific construction requirements, can form a module is 0.6 M plant a variety of group size and charge of single row, double row scaffolding, racks, sticks, material hoisting frame construction equipment, such as curve layout and can do. 2, high efficiency. Spell down faster than the fastener scaffold 4-8 times.
2017-05-09 -
The Tube Materials Determine the Price of the Scaffolding Tubes
Scaffolding tube is in the building or construction industry jargon, rack pipe in the construction site and have played an important role in many construction site in order to build more convenient construction higher floors and unable to direct construction, pipe rack can also provide construction personnel and the side of the road the pedestrian safety net to maintain security and periphery and high altitude installation, etc.
2017-05-08 -
What Problems Shall be Paid Attention When Using the Scaffolding Tube
Scaffolding tube can be the difference in construction site and the construction site; In order to more convenient decoration and construction higher floors and not directly; Rack pipe can also provide construction personnel and the side of the road the pedestrian safety net to maintain security and periphery and high altitude installation, etc. Under the scaffolding tube manufacturers as an introduction to using shelves tube what problem should note.
2017-05-08 -
What Are the Principles To Stack the Scaffolding Pipes in the Project Sites
Welded scaffolding tubes pile to the pallet under the premise of solid, ensure safety, according to the variety of welded scaffolding tubes, pallet specifications strictly operation, different kinds of welded scaffolding tubes to pallet, respectively, to prevent the occurrence of pick up is difficult, when taking or erosion. When stacking welded scaffolding tubes should follow the following principles: 1, ban around welded scaffolding tubes pile storage items for steel erosion;
2017-05-07 -
What Are the Right Ways to Maintain the Scaffolding Tubes in the Project
Frame scaffolding tube is often used to building or construction industry, and has many different functions, mainly to a higher floor decoration and construction and erection. Rack pipe also can be used to provide construction personnel and the side of the road the pedestrian safety guarantee, peripheral security fence and high altitude installation, etc. And we provide scaffolding tube shelf wholesale related services, is that you can enjoy the low price and high
2017-05-07 -
What Are the Difference Between Frame Scaffolding and Cuplock Kind
Scaffolding frame: scaffold is used in construction scaffolding, one of the most widely used of the frame scaffolding. Because the frame show "door" word, so called the door or gate type scaffold, also known as scaffolding frame. The scaffold is mainly composed of main frame, horizontal box, cross brace, scaffolding, adjustable base, etc. Frame scaffolding first developed by the United States, it has the tear open outfit simple, bearing performance good, safe and reliable use, etc, are developing fast.
2017-05-04 -
The Standard Sizes and Drawings of Frame Scaffolding
The frame of a standard scaffold by two pieces of the frame body, two diagonal member, four connecting rods, a hook of springboard. Gantry scaffolding usage basically as interior decoration or simple exterior wall construction, optional universal wheel, moving quickly. Can be used to decorate and do support body. Gantry scaffolding the development experience for a long time.
2017-05-04 -
Why Is the Scaffold Frame So Popular in the Construction Projects
Features: (1) scaffold can be composed of different groups of size, shape and bearing capacity of single and double row scaffolding, can according to the specific construction requirements, as a support frame, sticks, material hoisting frame, climbing scaffolding, cantilever rack and other functions of construction equipment. Can also be used to build facilities barrack, tents, lighthouse and other structures. Particularly suitable for erection of scaffold surface and reloading the racks.
2017-05-03