Measures to Take to Avoid the Harm From Falling Objects from High Level
1. Minimize placed on scaffolding tools, materials, etc., pay attention to the scaffold of mesa, necessary for items such as fixed by a rope.2. The small tool must use rope in the body.3. Stereo crossover operation is prohibited.4. Leave the danger zone with warning belt segregation, irrelevant personnel off-limits. Ground personnel pay attention to the positioning of the delivery of materials and give way.6. Isolation and collision avoidance and stance. Get an electric shock and lightning scaffolding work against electric shock and lightning
1. Stay away from the high voltage electrical equipment.
2. The thunderstorm weather high homework is prohibited. Scaffold inspection with listing 1. All scaffolding structures and demolition crews must hold up set up special operation license approved by the state.2. Of the scaffold shall be responsible for the specified scaffolding supervision and check the quotation.
3. In the use of scaffold should check once a week.
4. Shall not be used without inspection or check not qualified scaffold. Scaffolding in fall prevention plan of the work goal is to set up an independent scaffolding fall prevention support system, do it in any operating point can be convenient to hang buckle your seat belt, through the use of two root of the tail rope belt guarantee at any time in the fall. Fall prevention system should be able to do it even if the scaffolding collapsed, the operator of the scaffolding, also won't fall.
5. Set up "Z" glyph of stair, reduce climb the ladder.6. Working mesa all dangling end up rail (two 1.2 m / 0.6 m) and skirting board (more than 150 mm height), rail should be able to withstand 500 kg load level.7. Table spread with the scaffolding planks, closed flat between the scaffolding planks fixation.8. Prohibited personnel across the railing or across to the outside of the rail operations; Mat high working mesa is prohibited.