Key Points for the Use of Ringlock Scaffolding Safely in the Project

Time:2017/08/14

1, the build-up of high-level ringlock scaffolding, adopted by the various materials must meet the quality requirements.
 

 

 

 

 

ringlock scaffolding

 

 

 

2, high-level ringlock scaffolding foundation must be strong, before the erection of the computation, meet the requirement of load, and set-up, and according to the construction of drainage measures.
 
3, ringlock scaffolding, technical requirements should comply with the regulations of relevant specification.
 
4, must attach great importance to all kinds of structural measures: bridging, node, etc. Shall be set up according to the requirement.
 
5, horizontal closed: should be the first step, every step or two step, be put with ringlock scaffolding plank hand or foot basketry, ringlock scaffolding to laid along, overlapping joint should be shelved in a small bar, it is forbidden to appear short board.

 
Step 6, vertical closed: from the second to fifth step, each step all needs to the stud unavoidably side set up in 1.00 m high protective railings and pedal or set up network, protective pole (network) and vertical pole pin down; Step 5 above in addition to the set a guard rail, set net should be all set its safety or security; In concentration areas or residents along the street, it should be the second step, the outside all set net set its safety or security.
 
7, ringlock scaffolding, should be higher than 1.5 m above the top of the building or operating and added palisade.
 
8, the erection of ringlock scaffolding steel, fasteners, ringlock scaffolding and connections shall not be arbitrarily dismantled. Construction when necessary, must be subject to consent by the site, head, and take effective measures to process is completed, immediately recover.

 

 

 

 

 

ringlock scaffolding
 

 

 

9, ringlock scaffolding before use, should by the examination and acceptance of construction site, head of the organization, and present the single fill in the acceptance of rear can use. In construction process should have professional management, inspection and maintenance, and regular settlement observation, found abnormal should take timely reinforcement measures.
 