Installing Process For Tubular Scaffolding
Be born outside scaffolding process: the field leveling - concrete base casting or mat board - positioning set tong long vertical pole plate - emissions longitudinal rod to erect stem, sweeps the floor will be vertical sweep the floor and poling hooking to horizontal rod sweeps the floor installation, installation and longitudinal rod lateral horizontal pole to install bracing, install the wall piece - tie safety net - work shop layer, bamboo basketry and pedal.
According to the construction requirements, within the four corners of the building, the inner and outer posts are removed from the wall and marked. Straightening with steel tape, dividing pole position, and using small bamboo pieces to mark the pole. The pads should be placed accurately on the positioning line, and the pads must be laid flat and not suspended.
In the erection of the first layer in the process of the tubular scaffolding, the surrounding each framework with an inclined support, two-way open around the corner, waiting for the parts and steel frame and the main structure of the rear wall of a reliable Rachel can be removed. When the steel pipe rack operation layer is higher than 10 parts of the wall, the temporary stabilization measures should be taken, until the wall can be dismantled after it is set.
The double rack should stand upright and stand upright.Each row of upright rods should be placed at the end of each line, and one of the middle ones will be set up. The connecting rod of two vertical bars is perpendicular to the wall. When the pole is long, it is advisable to arrange the outer row and rear row.