Frame scaffolding as one of the most used scaffolding, both can be used as a common racks, can also serve as a special mobile scaffolding, but must be security issues will do a good job.
914 type frame scaffolding, mainly used in accessories have a fence, steel pedals, connecting pin, frame frame and diagonal member (do mobile scaffolding, also should be installed at the bottom of the universal casters).Scaffold is installed in what order? Hand frame of door type's erection sequence: basic; Put plate; Put the base; Vertical two common single-chip frame frame; Installation cross diagonal braces; Install the hook steel pedals; Install connecting pin, then according to repeat this process.
1, frame scaffolding assembly sequence: should follow from left to right, from top to bottom step assembly. And each layer to change the direction of the assembly, reduce error accumulation, not set-up, starting from the both ends to the middle so prone to dislocation phenomenon, very difficult to connect.2, the order of the scaffold erection of door: laid wood - the surface mounting base (with castor directly brake tight) - from one end of the installation installed frame scaffold and cross support - rack installed - steel ladder - level reinforcing bar, and then the location of the installation in accordance with the relevant provisions of scissors - additional installation of protective railings.3, the erection of scaffolding must cooperate with construction supervision, one-time set-up height should not exceed the longest wall three steps or free with highly & lt;6 m, this is in order to guarantee the stability of the scaffold.
Do anything to pay attention to gradual process, can not blindly rely on his own experience and not in accordance with the rules. Frame scaffold installation related directly to the user's life safety, therefore in the process of installation, the installation must be in strict accordance with the procedures.