Doule Row Outside Scaffolding
Using a Cuplock scaffold, it is convenient to set up two exclusive scaffolds, which can be quickly saved and quickly saved. It is especially suitable for setting up curved scaffolds and high-rise scaffolds.
At present, the maximum height of the floor scaffold with "one rod to the top" (i.e. Scaffold full height using single pole) has reached 90.3 m.
When used to construct the double exclusive scaffolding, generally made the horizontal distance (i.e., scaffolding corridor width) in 1.2 m (HG - l20), step distance of 1.80 m, poling longitudinal spacing in accordance with the building structure, scaffolding, height and load and other specific requirement, can choose 0.9 m, 1.2 m, 1.5 m, 1.8 m and 2.4 m size. According to the requirements, there are several forms:
(1) heavy frame: this structural scaffold takes a smaller vertical pitch (0.90m or 1.2Om) for heavy-duty operations or the underside of a high-rise scaffold.
For high-rise scaffolds, in order to improve the bearing capacity and the height of the building, take the upper and lower sections, and the vertical distance between each vertical bar is different. In the group frame, the lower vertical bar is 0.90m (or 1.20 m), and the upper segment is 1.80m (or 2.40 m), which is to eliminate one root at every other pole, and replace 0.9Om(HG-90) or 1.2om (hg-l20) horizontal bar with the horizontal bar of 1.80m(HG-180) or 2.40m (hg-240).
(2) the normal frame: is the most commonly used one, the structure size of 1.5 Om (poling longitudinal distance) x l. 2 Om (poling horizontal distance) x 1.80 m (interval) bar (below) or 1.8 Om x l. Om 2 x 80 m, l. on section can be used as a wall of build by laying bricks or stones, template engineering construction with the cuplock scaffold structure.
(3) the light frame is mainly used to decorate and maintain the scaffolding of the required work load, and the frame size is 2.4om (2.om).2om (l). 80m.