For scaffolding planks, already commonplace for this tool in the construction site and indoor and outdoor decoration is often used. But scaffolding, good or bad, directly affects the use of security issues. Therefore, we in the erection of scaffolding must be standardized operation after carefully check whether qualified.
The following introduce scaffold should pay attention to some of the problems in the process of erection of points:
1, be sure to keep in mind the scaffolding planks weight can not be more than 270 kilograms per square , inspection after reaching the standard can be used, to constantly in the process of repair and maintenance. If you have to ask weight must be greater than 270 kg/square should be redesigned and retrofit.
2, steel pipe pile pillar install metal seat, other materials of special terrain needs on the ground mat spread or sweeping the floor.
3, the scaffold should be vertical to the ground, vertical tilt shall not be less than one over two hundred of the scaffold height, the distance between the vertical rod is more than two meters.
4, scaffolding at both ends, the corner between every six to seven scaffolding planks columns should install knife brace and the strut, height is more than seven meters can't install the strut, vertical 4 meters, transverse link every seven meters and stair is firm.
The outer edge of the 5, scaffolding, ramps, platform set up 1.05 meters of fence. Laying bamboo or wood, both ends must tie and firm, it is forbidden to not tie nine such as using the head.
6, examination and acceptance of scaffolding planks also need to put all the parts appearance inspection, and in strict accordance with the laws and regulations system.