Before building a d to hardening of concrete and it will install root ramming formation.3, need to offer a scaffold of elevation of uniform requirements. Ensure the steady d and security.4, after completing a d to have enough bars and shears, or to strengthen steady.
New ringlock in the operation of the process of scaffolding temporary fulfilling champion out its good function, a new ringlock scaffold don't need to squeeze a catapult, can ensure the reasonable distribution of tension and pressure, the guarantee is very good steady d function at the same time also ensure that the balance of a d, prevent the tightening of some deeds unsafe factors.
Hard to cut down material, to split time, in order to avoid presents the phenomenon of missing parts. Operating rope bind components, the need of high operating under the pulley will delay the shipment, random dumping is prohibited. Again the material shipped by specialized personnel in the d address, classified storage. Pay particular attention to button scaffold small parts are properly preserved.
And in the process of operation can be adjusted by construction professionals themselves. The scale of the product unified operation packaging. After z and verification in practice, if the beam span is less than 15 meters, clearance d cross layer is less than 12 meters high, the multi-span continuous beam and frame structure building template as a support system, button scaffold stability d should be stronger than the buckle bowl of scaffold and doors scaffold.
Above is about the scaffold specifications of demolition technology content, users in the actual operation process, an d cannot remain these safety standards, to ensure the safety of construction.