Even the safety of construction equipment, high in use process will appear because of the small details, frame scaffold is no exception. New frame scaffold with new carbon structural steel production, high strength mechanical properties, single vertical rod load of 200 kn, even if again big load considering the construction of the scaffold is not a two layer, so you must be aware of when setting reasonable setting between various components.
A, the load is to frame scaffolding can't more than 270 kg/m2, to speak after acceptance and get listed qualified to be able to use, often in use in the process of inspection and maintenance.
Second, frame scaffolding accessories in the steel pipe column should set the base metal, if geological soft should be based on mat board or sweep lever is set.
Three, for frame scaffolding accessories rod should be vertical, the vertical deflection Angle can not exceed 1/200 of the height, the vertical bar spacing between no more than two meters.
Four, for the plate buckles at both ends of the scaffold and the corner of each column should be set up to 6 to 7 root knife brace and the strut, if more than 7 meters high, and unable to set upright, to every 4 meters, vertical and horizontal every 7 meters have to must and building strong connections.
Five, the outer edge of the frame scaffolding accessories, ramps, 1.05 meters platform to set up the fence, when laying bamboo and wood, for both ends must be binding and firm, not tied to be put into use is forbidden.
Six, for channel and escalator frame scaffolding accessories bar should be heightening reinforcement, it is forbidden to hinder the channel.