What Are the Design Principles of Ringlock Scaffolding in the Project
Outside the scaffolding planks, the erection of steel scaffolding, climbing frame, hanging blue, pick frame scaffold before construction, must prepare the monomial construction scheme, after the approval of the company's technical director, to detailed operational personnel to attend safety technical disclosure. Shelf after the completion of the erection of safety supervision departments must have a company for acceptance shall use or piecewise acceptance party.
Reasonable protective measures to be able to more effectively protect the personal safety of workers, so as to avoid accidents. So steel scaffolding planks to prepare protective measures.
Construction steel scaffolding planks drilling design can solve the problem of surface drainage, suitable for all kinds of weather conditions for the construction. Using hot dip galvanized steel scaffolding planks for construction, build the scaffolding steel pipe can be appropriately reduced, not only save construction materials and can improve the efficiency of building.
Steel board not only in material but also on the economic front has great advantages, reduce maintenance and reinforcement steel scaffolding planks, easy to use, by the construction industry, galvanized steel punching the scaffolding planks, the construction industry is the necessary equipment.
(1) operating the outer layer must have double fence, outside with dense mesh net shelf totally enclosed, interface seal.
(2) the operating layer scaffold board must spread, no probe plate, twisted board cannot use, had better use steel scaffolding planks shelf.
Distance is not more than 20 cm from the wall.
(3) the steel pipe scaffold every four steps in the frame consists of a layer of safety net, to prevent falling objects.
(4) suffering from high blood pressure, heart disease, anemia, epilepsy, color blindness, is allowed to set up operations.