Scaffolding set-up and dismantling of mobile frame type
Type mobile frame scaffolding generally positioned according to the following procedure:
Laying stow-wood (plate) - stay, put the base - stand up since the end mobile frame and then with the bracing and horizontal beams installed (or scaffold board) to put a ladder, when needed, the usually equipped longitudinal rod to furnish even wall bar, according to the above steps, result installation to install long to strengthen the overall stiffness of bracing, installed at the top of the rail.
Erection of mobile frame type scaffold, basal must first formation compaction.
Wall tube scaffold must pass the wall and wall of Rachel, and used the fastener steel pipe and in a direction of the intersection of the mobile frame.
Whole scaffolding must be placed a moderate amount of horizontal reinforcement bar (longitudinal bar), the first three layers to each layer Settings, three more than every three layers together.
Outside the frame side set long bracing. Use wall tube or even the wall with connect the scaffolding and buildings. High-level scaffold should be increasing even wall layout density.
Components shall be carried out from top to bottom, during the demolition of frame removal order and installation phase sequence
Mobile frames scaffold erection for more than 10 layer, should be adding auxiliary support, generally between 8 ~ 11 floors gantry frame, wide between the five gantry framework, adding a set, made by the wall under part load