The Dismantlement of Scaffolding Be Done in Such Way
In dismantled scaffolding, end start to remove the top of the armrest and baluster, then remove the pedals (or level) in order to remove the escalator, interspersed with pole, door frame, take out the core. Put step frame scaffolding down next door after the removal of scaffold, until the basement.
Removal of connecting parts, should be the pin on the pin board and card hook to open position on the lock plate, not hard to pull, it is forbidden to tap and damaged parts. Set-up before the product base must be strong, through calculation, meet the requirement of load, and set-up, and according to the construction of drainage measures. Must attach great importance to all kinds of structural measures: bridging, node, etc. Shall be set up according to the requirement.
Level is closed: should be the first step, every step or two step, be put with scaffolding plank hook or foot basketry, scaffolding to laid along, overlapping joint should be shelved in a small bar, it is forbidden to appear short board. And in every four step laid between stud and metope system bottom has long security.
Vertical scaffolding tubes closed: steps from the second to fifth, each step all needs to the stud unavoidably side set up in 1.00 m high protective railings and pedal or set up network, protective pole (network) and vertical pole pin down; Step 5 above in addition to the set a guard rail, set net should be all set its safety or security; In concentration areas or residents along the street, it should be the second step, the outside all set net set its safety or security.