ADTO News
The Connection Between Scaffolding Parts Shall Be Stable
Top mobile scaffolding foundation must be strong, before the erection of the computation, meet the requirement of load, and set-up, and according to the construction of drainage measures. Top mobile scaffolding must attach great importance to all kinds of structural measures: bridging, node, etc.
Shall be set up according to the requirement. Level is closed: should be the first step, every step or two step, be put with scaffolding plank hand or foot basketry, scaffolding to laid along, overlapping joint should be shelved in a small bar, it is forbidden to appear short board.
Vertical scaffolding tube is connected with the axis of socket, rail with made by bowl joint connection, connection with reliable bending, shear and torsion resistance performance. And axis to the bar a little bit, node within the frame plane, therefore, the structure is stable and reliable, large bearing capacity.(to improve bearing capacity, the whole frame about than equally clear case fasteners welded pipe scaffold increased by more than 15%.
Safe and reliable: connector design, considering the bowl on the screw friction force and the gravity, make joint reliable self-locking ability. Under the load acting on the bar through the bowl is passed to the scaffolding tube stud, the bowl has a strong ability of shear (199 kn). On the bowl even if is not pressure, rail joint also does not emerge and cause accidents. At the same time equipped with a safety net support, between rail, scaffolding, baseboard, ladder.
Scaffolding prices in July after continuous lift, attack on the capital market a strong boost to the spot market sentiment. Upstream scaffolding billet prices have stronger timber prices pull up after shipment also make market pushed up to postpone, scaffolding prices reverse seems to have formed.