ADTO News
The Comparison between Aluminum Formwork and Conventional Formwork
The comparison between Aluminum Formwork and conventional formwork is listed clearly in the below table.
Series No. |
Characteristics |
Conventional Formwork |
|
1 |
Speed of construction |
Four days cycle per floor |
Min. Cycle time is of 1 day |
2 |
Quality of surface finish |
Excellent. Plastering is not required |
Bad. Plastering is required |
3 |
Pre-planning of the formwork system |
Required |
Not required |
4 |
Type of construction |
Cast-in-situ Cellular construction |
Simple RCC framed construction |
5 |
Wastage of Formwork material |
Very less |
In great amount |
6 |
Accuracy in construction |
Accurate construction |
Accuracy is less than Modern Systems |
7 |
Coordination between different agencies |
Essential |
Not necessarily required |
8 |
Resistance to earthquake |
Good resistance |
Less than modern systems |
9 |
Removing of floor slab forms without removing props
|
Possible |
Not possible |
10 |
Need for any timber or plywood |
Not required |
These are the main components |
11 |
Re-usage value of formwork system |
250-300 |
Maximum 50 |
12 |
Suitability for high rise construction |
The most suitable |
Not suitable |
13 |
The initial investment in the system |
High |
Less |
14 |
Economy in Construction |
Economical for mass |
Economical on the small scale |