The Check&Acceptance After Setting Up Scaffolding
The frame structure conforms to the requirements of the construction plan, and the size change of individual parts should be within the allowable adjustment range; The node security connection is reliable.
The scaffold clamp tighten degree should be controlled in torsion moment 40 n. n. m ~ 60 m, where all welding welding quality should be reliable, embedded parts of embedding should comply with the design requirements, have sufficient strength, joint connection of wire rope should be reliable;
Vertical bar vertical should be less than or minus 300, and the maximum vertical deviation value should be controlled at the same time. The horizontal deviation of the vertical horizontal rod should be less than 1/250. And the value of the whole frame is not greater than 50mm; The work layer paving and safety protection should meet the relevant requirements;
The acceptance and daily inspection of mobile scaffolding shall be carried out on a regular basis. After the inspection is qualified, the party shall be allowed to use or continue to use it.