The Building Erection of Ringlock Scaffolding On the Stage
1, the position of the first roughly on the ground, set the four base, adjust well below the leg, in a horizontal plane;
2, base on the four corners of the outside of the insert at the bottom of the inclined support section, each Angle 2 root, a total of eight root;
3, put the head screwed on the base, pay attention to the direction of rotation to the head is the same as noted in figure;
4, set a good party set in the head;
5, connect the beam on the ground;
6, aluminum alloy ringlock scaffolding the ends of beams, respectively, and two sets of good docking link, on either side of the beam section at this time on the ground was assembled;
7, connect pillar lie truss flat is good, then put one end on the head and the other end of the screw on the cross arm, at the same time hang bottle gourd and cross arm link is good, the role of the hoist is used to enhance the following bar truss;
8, more than one person together the pillar truss stand up slowly, pay attention to do not force too big pushing columns to, and then fixed against the screw head;
After 9, aluminum alloy ringlock scaffolding pillar erected, the hanging hoist hook through condole belt hook stay below the cross beam;
10, 4 people together slowly drag hanging hoist pull beam around a person's head position;
11, above the beam installed lighting audio equipment;
12, 4 people together drag hanging hoist to scheduled height to stop;
13, put one end of the inclined support and tighten the post, the other side and the base of horizontal support tight, so light frame will be finished building.