The Advanced Aspect of ADTO Aluminum Formwork

Time:2019/01/18

 

Comparison between ADTO Aluminum Formwork and Conventional Formwork:

 

ADTO Aluminum Formwork

Conventional Formwork

Ease of construction and easy to remove Formwork components. Labor-saving and cost-saving

Very hard to remove Formwork and require more labor to remove Formwork

Same Formwork can be used up to 1000 times

Same Formwork can’t be used more than 10 times.

No need of plastering

Need for plastering

High seismic resistance

Low seismic resistance

Faster erection of Formwork

Takes more time to construct Formwork and remove

 

 

Work Cycle of ADTO Aluminum Formwork:

 

Day#1

The first activity consists of the erection of vertical reinforcement bars and one side of the vertical formwork for the entire floor or a part of one floor.

 

Day#2

The second activity involves the erection of the second side of the vertical formwork and formwork for the floor

 

Day#3

Fixing reinforcement bars for floor slabs and casting of walls and slabs.

 

Day#4

Removal of vertical formwork panels after 24hours, leaving the props in place for 7 days and floor slab formwork in place for 2.5 days.

 

 