ADTO News
Technical Requirements on the Erection of Scaffolding Ringlock
Ringlock scaffolding and scaffolding used materials and the erection method is the same as ordinary steel pipe fastener scaffold, specific requirements are as follows:
1, poling: ≯ 2 m, horizontal stud spacing interval ≯ 1.8 m, the ground should be leveling to consolidate vertical pole into the ground 30 ~ 50 cm, would not be buried, stud should pad under sleepers and added rod sweeps the floor.
Step 2, bar: lateral horizontal tie from ≯ 1.8 m, the operational layer of ledger spacing ≯ 40 cm.
3, bracing: four corners should be set Angle brace, bracing, four edges of every four row among poling along the longitudinal set a bracing, brace and bracing shall be bottom-up continuous Settings.
4: laying, frame board frame within 4 m high, frame plate clearance ≯ 20 cm, to 4 m tall, frame plate must be spread
Feeding platform erection of safety technical disclosure
Set-up, 1, feeding platform independent platform from derrick clearance shall not exceed 10 cm, platform width to the principle of front-rear convenient length should be hanging bar or lateral.
2, build material: general use fir or steel build-up, when bearing weight is within 300 kg and height is not high also can use bamboo set-up should be used (selected), basic is the same as the scaffold erection method.
3, use structure: mainly as tic-tac-toe frame hanging basket front-rear channel used, generally do not pile up materials.
The main bar are: vertical rod, bar, horizontal bar, bracing, railings, etc.
4, set-up:
(1), vertical pole spacing within 1 ~ 1.5 m, step away from 1.5 m to 1.8 m depending on tall buildings, flat platform for every floor.
(2)every 1 ~ 1.5 m high, set a lateral horizontal tie, at the operational layer channel can be located in 1.8 m high.