WHOLE SCAFFOLDING & FORMWORK SYSTEM (DESIGN) SERVICE SUPPLIER!

update
> ADTO News > What other advantages can you get from the ringlock scaffolding

Suggestions From Scaffolding Suppliers About How to Build the Scaffolding

Time:2016/09/29

Cuplock scaffolding dismantling points, the frame body dismantling shall be fully inspection before scaffolding connection, supporting system, such as whether conform to the requirements of the structure, according to the technology management program approval to implement demolition job.

 

 

scaffolding

 

 

Scaffolding demolished before, on-site engineering and technical personnel for on-the-job operators targeted safety technical disclosure. Dismantled scaffolds shall be designated safety, set up warning signs, send modes. Demolition workers, a place, must hold relevant certificates, must wear safety helmet, fasten your seat belt, chaps, wear soft shoes. Should be removed before the appliance of the scaffold and the excess material and sundry.

 

 

Demolition order should follow the top-down, first build after the demolition, after and take the first principles. At the same time step should be a clear, strict 1 ban and homework at the same time. Bowl scaffold joint structure characteristics: the bowl buckle connected to the vertical bar, a bowl, Z weld, welding. On the bowl buckle connected to the vertical bar, a bowl, spins self-locking type, socket. Bar features: flat bar together with female head diagonal node, joggle naturally. Poling, seamless welded steel pipe, joint a word Card, double docking.

 

 

 

scaffolding

 

Binding: nodes have the function of the 3 d and the vertical rotational constraints, to horizontal can turn around the stud. Bowl set key, the bottom of the scaffold of the assembly quality directly affects the quality of the whole frame, therefore, we will strictly control the erection quality.

 

When after assembling the layer 2 bar, first check and adjust the level of the framework straight Angle and longitudinal straight which affects (the curve of the scaffold should guarantee the correct position of the vertical rod);Second should check the levelness of the rail, and by adjusting the vertical pole adjustable seat between the cross bar horizontal deviation is less than 1/400.

Related News