Product Categories
- Scaffolding
-
- Ringlock Scaffolding
- Tube and Coupler System
- Frame Scaffolding
- Kwikstage Scaffolding
- Cuplock Scaffolding
- American Style Scaffolding
- American Scaffolding
- Cuplock System Frame System Scaffold Deck Tube & Clamp Multi-function Scaffold
- Scaffolding Planks
- Scaffolding Screw Jack
- Shoring Prop
- Ladders and Staircases
- Ladder Beam
- Scaffolding Accessories
- More Scaffolding
- Steel Prop Scaffold Clamps Kwikstage System Ringlock Scaffold System Base Jack Frame Scaffold System Screw Jack
- Steel Pipe
-
- Galvanized Steel Pipe
- Pre Galvanized Steel Pipe
- Square Steel Tubing
- Rectangular Steel Tubing
- Seamless Steel Pipe
- ERW Steel Pipe
- LSAW Steel Pipe
- SSAW Steel Pipe
- Pipe Fittings & Flanges
- Stainless Steel Pipe
- Stainless Steel Welded Pipe Stainless Steel Seamless Pipe
- More Steel Tube
- Pre Galvanized Steel Tube Square Steel Pipe Rectangular Steel Pipe ERW Steel Tube LSAW Steel Tube SSAW Steel Tube
The thread rolling rollers for thread rolling machines are suitable for all types of thread rolling machines, it is customized. Whatever the threading pitch you want, we can make it for you.
Size | Quality Level |
71x45x3.0 (inner dia (have sleeve) is 30), have mark: 1,2,3 | High |
71x45x3.0 (inner dia (have sleeve) is 30), have mark: 1,2,3 | High |
62.5x45x3.0 (inner dia (have sleeve) is 28), have mark: 1,2,3 | High |
62.5x45x3.0 (inner dia (have sleeve) is 30), have mark: 1,2,3 | High |
62.5x45x3.0 (inner dia (have sleeve) is 28), have mark: 1,2,3 | High |
71x45x3.0 (inner dia (have sleeve) is 30), have mark: 1,2,3 | Medium |
71x45x3.0 (inner dia (have sleeve) is 30), have mark: 1,2,3 | Lower |
Technical Advantages
1) High splice strength, which could exert ultimate tensile and compression strength of rebar, it could satisfy the requirements stipulated in the Chinese standard JGJ107, American standard UBC1997, British standard BS8110, French Standard NF35-20-1, German standard DIN1045, ISO15835 and other requirements in the relevant standards;
2) Easy to operate and maintain, no need for technicians, fast splicing on construction site;
3) Several types of splices, which could be suitable for rebar splicing when the rebar cage or the bending rebar is used;
4) High production efficiency, it only takes less than 1 minute to upset and make one thread on the site;
5) High adaptability, the splicing could be conducted when the power is off, or under water, or at super high position, or windy, rainy and snowy weather.
6) Environment-friendly, material-effective.
7) Inexpensive to purchase, maintain and repair.
8) The Splicing could be produced in advance without influencing the construction period.
9) Full-Tension splice, bar break under tensile tests.
10) Manufactured under strict quality assurance plan ISO 9001
Application: