Time:2017/07/17

A, the material
1. The set-up need the steel pipe scaffold use steel scaffolding planks, fasteners and parts must be unified specifications, complete documents, stop using the defective goods and nonconforming steel pipe.

 

 

 

 

scaffolding planks

 

 

 

Materials management personnel should according to the plan and disclosure check material specification and quality, and acceptance formalities and organize qualitative data;
2. The use of steel tube in the quality should comply with the GB/T700 - grade A steel Q235 regulation, should adopt the straight seam welded steel section current < GB/T13793 >
Or the flow of low pressure lose for weld reinforcement "(GB/T3090) specified in the ordinary reinforced 3) requirement, smooth incision, it is forbidden to make


With deformation, cracks and serious corrosion steel pipe.
Second, the security matters
1. The shelf board must hold the operation certificate of special operation personnel professional scaffolder, safety test must be conducted before mount guard, after qualified
Before mount guard;


2. On the steel board personnel must wear non-slip shoes, wearing a seat belt usage right, dress spirit;
3. Enter the construction site must wear the helmet, qualified fasten jaw belt, lock buckle;
4. High (2 meters) operations must be qualified safety belts, hang, high low with;
5. Steel scaffolding planks must pave, firm and smooth. Can not have the probe plate, with the frame body belay;
6. The shelf operation personnel shall make good division of labor, coordination, transfer bar should hold good focus, smooth transmission;

 

 

 

 

scaffolding planks

 

 

7. Workers should wear a tool bag, do not use tools on the shelf, so as not to fall from;
8. Building materials increases with the increasing in it, so as not to fall from improper placement;
9. During the erection of operations, the ground with the personnel to avoid possible falling objects area;