Several tips for multi-poles scaffolding removal
1) frame scaffolding removed, the job should be divided into zones, located around the fence or warning signs erected, the ground command designated persons prohibited non-operating personnel to enter.
2) removal of scaffolding workers in high places, must wear a helmet, wear seat belts, tie legging, wear soft-soled shoes.
3) the order to be followed by the removal of the scaffolding on and on, after the first ride demolition, demolition after take the first principle. That is the first demolition of railings, scaffold boards, scissors, bracing, after the demolition of a small bar, a large bar, pole, etc., according to the principles of clear step sequentially, and down at the same time is prohibited to dismantle the scaffolding work.
4) pole when the demolition, should hold the pole and then open the last two buckle, scaffolding removed a large bar, bracing, when the scissors, you should split the middle button, then hold the middle, then the solution ends buckle .
5) even wall point should be removed layer by layer with the progress scaffold scaffolding dismantled, before dismantling bracing should set up a temporary support, then split bracing.
6) scaffolding removed to a unified command, echoing up and down, motor coordination, and when another person related to untie the knot, it should first notify the other party may fall.