ADTO News
Secure Technical Measurement To Set Up Frame Scaffolds
1. When the scaffold is moving, it must be at a certain distance from the neighboring side and assign special person to look after;
2. In mobile, it is forbidden to start accelerating suddenly.
3. Check the frame scaffolding regularly, find the problems and hidden dangers, and repair and reinforce the construction timely before the construction work, so as to achieve solid and stable construction and ensure the safety of construction.
4. It is forbidden to mix the steel bamboo and steel wood, and prohibit the mixing of fasteners, ropes, wire, bamboo and plastic
5. Scaffolds must be held on a certificate, and proper use of safety helmet, safety belt, skid shoes and high altitude work must be fastened.
6. It is strictly forbidden to have the probe board in the footboard, and the construction load should be balanced as far as possible.
7. The integrity of the scaffold shall not be pulled together with the derrick or lift, and the body shall not be truncated.
8. After the construction of the outer scaffolding of the scaffold, after the completion of the support, the safety personnel of the project department shall be qualified for use. Any team leader and individual shall not arbitrarily dismantle the scaffold parts without consent.
9. Strictly control the construction load, the foot pallet shall not be concentrated in the heap, and the construction load shall not be larger than 2kN/m2 to ensure a large safety reserve.
10. The working layer shall have reliable protective fencing and baseboards to prevent falling objects from hurling people.