Preparation Requirements of Building of Scaffolding Tubes in Frame Scaffolding
As time goes by a lot of building materials are changing, also get increasingly perfect and mature, before the traditional bamboo scaffold has been eliminated in the market, in relative to the remote mountainous area, may be the traffic is not developed, the lack of money, and so on, some construction personnel in the use of this kind of scaffolding, also a little bit of developed area has been replaced this kind of building materials, to be on the safe side, these has been basically eliminated.
Ordinary because of its simple maintenance and long service life and low cost of a variety of advantages, occupy more than 70% of the country's domestic market, and has a larger development space, the following will explain prepare before the erection requirements:
1, frame scaffolding foundation must be solid, and should do well in drainage slope, in case of water
2, frame scaffolding, order: basic preparation to put plate, put the base - vertical two common single door frame and install the crossbar to install scaffolding, on this basis, repeat install door frame and cross bar, scaffold board process.
3, door type steel pipe scaffolds should start at one end to the other end of the set-up, scaffold should be done in the next step after the completion of the scaffold erection. The erection direction contrary to the next step.
4, the first step of scaffold erection, should first base in the endpoint insert two common door frame, and then fitted with fixed cross rod, lock the lock plate, and then after the erection of the door frame, each cross, then mount the crossbars and lock.
5, the scaffold must be set with reliable link building.
6, type steel pipe scaffolding tubes of lateral bracing should be set up, the vertical and longitudinal shall be set up in a row.