WHOLE SCAFFOLDING & FORMWORK SYSTEM (DESIGN) SERVICE SUPPLIER!

update
> ADTO News > What other advantages can you get from the ringlock scaffolding

Please Build the Ringlock Scaffolding In A Right Way

Time:2016/08/18

Ringlock scaffolding, templates, erection of height of 24 m or less; When more than 24 m, shall be computed separately designed.


Ringlock scaffold system as a template support build-up should be calculated according to the construction scheme of poling bent frame size and choose fixed horizontal pole, combination according to the height of support set of poling period, adjustable bracket and adjustable base.

 

 

scaffolding


Ringlock scaffold when setting height of 8 m or less and template, step distance of 1.5 m or less, support frame body facade of the first vertical diagonal cross each layer were set up, both in the bottom and top rack body vertical diagonal should be set up, and should be in the inner regions of the scaffolding frame body every 5 across from bottom to top longitudinal and transverse all set set-up of large vertical diagonal or use fastener steel pipe bracing.


When and template support frame body height is not more than 4 section stud, not set at the top level diagonal; When the frame body height exceeds 4 section stud, should be set at the top level diagonal or fastener steel pipe horizontal bracing.

 

scaffolding


Ringlock scaffolding when setting height of 8 m or template, and vertical diagonal should be spread across Settings, horizontal interval of 1.5 m or less, along the height of every 4 ~ 6 section stud should be set level layer diagonal or fastener steel bracing, and should be reliable and the surrounding structure formation. On long strips of independent high formwork and the ratio of the total height and the width of the frame body H/B should not be bigger than 3.

Related News