WHOLE SCAFFOLDING & FORMWORK SYSTEM (DESIGN) SERVICE SUPPLIER!

update
> ADTO News > What other advantages can you get from the ringlock scaffolding

Methods for Erecting Formwork System

Time:2018/12/18

 

The erecting method of Formwork System can be concluded as follows.

 

One side is erected using only on the upper and lower pin and wedge connection. Later, ties are inserted at the other connections and fixed with pin and wedge. Then the previously installed pins are removed and ties inserted and pinned. Subsequently, panels for the other side are inserted between the existing ties and fixed with pins and wedges

 aluminum formwork applications

 

Care must be taken so that the concrete and in particular the reinforcement does not become contaminated due to the excessive or negligent application of the releasing agent.

 

The ends of walls and door openings should be secured in position by nailing timber stays to the concrete slab. Walls require to be straightened by using a string line and securing the place by nailing timber stays to the concrete slab. During this operation verticality of door openings also requires to be checked for plumb. If possible, door spacers should be fitted.

 aluminum formwork wall panel erected on site

 

Special care must be taken, at the lift shafts. The interior panels will align properly on their own because they are set on the kicker from the formwork below. Ensure the kickers are level and will not affect the vertically of the lift shaft, However, the matching panels are set on the concrete that may not be level. If the concrete is too high in place, it can distort the alignment of the four sides of the lift shaft and must be broken out to allow a level base.

 

 

Related News