WHOLE SCAFFOLDING & FORMWORK SYSTEM (DESIGN) SERVICE SUPPLIER!

update
> ADTO News > What other advantages can you get from the ringlock scaffolding

Merits of Aluminium Formwork

Time:2018/12/12

 

1. Fast construction speed. ADTO Aluminum Formwork System Particularly suitable for large magnitude construction of respective nature at one project site.

 adto aluminum formwork system

 

 

2. Modular system design. As the system establishes a kind of “Assembly line production” phase-wise completion in desired groups of buildings can be planned to achieve early utilization of the buildings.

 

3. Formwork system components are durable and can be used several times without sacrificing the quality or correctness of dimensions and surface.

 

4. Compared to another type of the modern formwork systems, the Aluminum Formwork does not depend upon heavy lifting equipment and can be handled by unskilled labors.

 

5. Construction carried out by the system has exceptionally good quality with accurate dimensions. Concrete surface finishes are good to receive painting directly without plaster.

 

6. Monolithic construction of load-bearing walls and slabs in concrete produces structurally superior quality with very few constructions joined compared to the conventional column and beam slabs construction combined with filter brickwork or brickwork subsequently covered by plaster.

 adto aluminum formwork sor sale

 

 

7. In view of the four-day cycle of casting the floor together with all slabs as against 14 to 20-day cycle in the conventional method, completed RCC structure is available for subsequent finish trades much faster, resulting in a saving of 10 to 15 days per floor in the overall completion period.

 

8. As all the walls are cast monolithic and simultaneously with floor slabs requiring no further plasters finish. Therefore the time required in the conventional method for construction of walls and plastering is saved.

 

 

Related News