WHOLE SCAFFOLDING & FORMWORK SYSTEM (DESIGN) SERVICE SUPPLIER!

update
> ADTO News > What other advantages can you get from the ringlock scaffolding

How to remove the scaffolding in a safe way

Time:2016/04/05

1. Construction scaffolding outside each take one, after pitched the end, after the project department safety inspection staff pass before use. Any small group leaders and I can not agree without arbitrary removal of scaffolding components.

 

scaffolding for sale

 

 

2. strictly control construction loads, scaffold boards shall concentrate stockpile facilities charge.

 

3. The structure does not allow the construction of a multi-layer also homework, homework renovation construction not exceed two floors.

 

4. Each layer is provided between homework robust protective fence to avoid falling objects wounding

 

5. Regular reflection scaffolding, identify problems and risks, before the application of real-time maintenance tasks industry consolidation, in order to reach the consolidation of change, to ensure construction safety.

 

scaffolding for sale

 

 

Scaffolding structure requirements and skills approach

Pole: the whole building scaffolding with double single-pole, pole top overriding tectonic cornice epithelial 1.5m. Pole butt joint fastener convergence, pole with a large bar right angles fastener convergence. Interleaving joint placement, two adjacent columns appear in sync with the joints to prevent cross within and highly biased staggered intervals of not less than 50cm.

Related News