WHOLE SCAFFOLDING & FORMWORK SYSTEM (DESIGN) SERVICE SUPPLIER!

update
> ADTO News > What other advantages can you get from the ringlock scaffolding

How to Process the Frame scaffolding Node in the Construction

Time:2017/05/31

1 The improvement of the connection of the scaffold on building corner frame scaffolding can use short steel tube and fasteners will issue.

 

 

 

 

 

frame scaffolding

 

 

 

  
Together as whole. Connected short steel tube should be in each step from the top of the door frame and the top of a 900 mm arranged so that the laying of scaffold board and increase the Angle position stiffness.


2 frame scaffolding is used to connect the corner of the building and the connecting rod, to ensure the overall stability of the scaffold. Tie bar spacing, vertical direction of each floor is not more than 4 m, horizontal direction every 4 m set a join point across. Safety of the helical baffle diagonal compression something appropriate proper encryption.


3 for the structure of the entrances and exits, construction equipment attached to the wall place need scaffold for the mouth of the cave, such as vertical fracture, can adopt comprehensive first, after a local, with steel reinforcement method to deal with, and on top of the mouth of the cave with oblique angle steel pipe for reinforcement.


4 frame scaffolding set-up height exceeds 50 m,  Should be set on the steel with scaffolding, and formulated the corresponding construction scheme.

 

 

 

 

frame scaffolding

 

 


 

the removal of scaffolding  
(1) scaffold on the surface of the product should be ready before dismantling buildings protection, debris and rubbish on the scaffold should be cleaned up, and has been careful scaffolding demolition scheme, safety technical disclosure to the relevant staff. Completes the alert limits and the danger signs.

Related News