How To Dismantle the Scaffolding With Different Working Height
Scaffolding below 10 meters high, can not consider weight factor, when up to 10 meters high above, an to consider self-respect. Such as scaffolding across 15 meters high, so, of poling extension should be staggered Settings, making poling long slot is not the same degree of surface, to ensure that the scaffold of d on the whole.
On the construction personnel to fasten your seat belt, wear a good helmet, fully safe protection. In the process of dismantling d according to the top-down, after and take the first principles.
The scaffold structure design is reasonable, adopt vertical shaft axial force, this structure design makes the scaffold on integral in three-dimensional space structure with high strength, steady function, the advantages of the self-locking function reliable, which can effectively improve overall stability scaffolding system and security, can better meet the construction requirements. So, for this kind of scaffolding operation, if there is no specification, no security. The following supplied by the company to users wheel button scaffolding operation specification.
In the demolition of a large scaffold a to leave after the chute, channel, first on the reinforcement, lunch after demolition to ensure its integrity, security remains the same. At the time of demolition, if there is a electric circuit, in near to adopt isolated way. Strictly forbidden to contact rod and wire.
Don't touch when demolition scaffold bad doors and Windows, spout, eaves tile, etc. Some items.
Scaffold should operate the same elevation of beam bottom elevation scale, height and large span for d a component supporting bracket during operation, dealing with cross bar tension and poling axial pressure and checking, to ensure that the frame body of security.