Homework layer, unit load (personnel, materials, and equipment component) shall not be beyond the specified value or construction value. The layout of scaffolding for 3000 cows per square meter; Scaffolding for 3000n per square meter. Frame material accumulation on the surface of neat to ensure that the workers operation and personnel passage.
Are not permitted under any circumstances, dumping data items and dumping rubbish from the shelves. Operations, it is strictly prohibited to the basic framework of the random removal of scaffolding rods, cohesion and integrity bar fastener.
you need to remove the nod to professional answer. Job, pay attention to self security maintenance, prevent knock against, slip and fall. It is forbidden to resting in the rack frolicking and sitting on a rail. Remind everybody to pry, pull and push operation, attention should be paid to take the correct posture, fasten your seat belt, wary of instability of body fall, fall, or put things out. On the scaffolding dismantling templates, the bracket of necessary measures should be taken to, in case of removed material fall outside the frame.
When scaffolding surface height is not enough, need padding, must take the stable and reliable, and shall not exceed 50 cm high, heightening the safety protection facilities at the same time; When more than 50 cm, design according to the application for examination and approval. This is also the scaffold of selling the company should inform the customer. Scaffolding is a tool as one of the building cannot be little ranged, at the time of use, can not be able to sleep on it, or have a rest or play, etc., it is easy to have problem.