How Much Material Will Be Needed to Build One Meter Scaffolding
The scaffolding after to buy or lease, are often scattered, need according to the needs of their own, specific to build. How much material the scaffold erection of square meters need?
This is a lot of people are asking a question, and the materials they need to the erection of scaffolding, including rail, and poling, there are some other pieces of small objects, etc., be sure to calculate good, otherwise, it's easy to have a can't meet the demand of the erection.
One square meter of scaffolding cannot specify the number, only through the experience obtained data, but the data is a common phenomenon, the number of concrete must be determined by the construction site of the calculated position, and the frame body height, bar spacing, poling, and interval. The erection of a square scaffolding needs to how much material? Usually, it needs to calculated by professional personnel, this can be more reasonable.
Scaffolding frame rail, stud spacing is 1 m * 1 m, step distance of 1.5 m, the height of 2.8 m, the frame body area of 10 square meters (hypothesis 2 m * 5 m), then the total frame body is 1. The length of the single frame: (5 + 2 + 1) * (5 + 1) * 2 = 27 m. Step 2. The distance of 1.8 m, the height of 2.8 m, there were three layers frame body, the third layer of total 27 * 3 = 81 m.3. The stud is: 6 * 3 = 18 root, 18 = 2.8 * 2.8 m height. All frame body total 4.10 square meters (excluding bracing, brace, etc.) 81 + 50.4 = 131.4 m.5. The scaffold is a square meter for 131.4/10 = 1.31 m.
Through the above introduction, we build a square meter scaffolding need to how much material the answer to the question already has a certain understanding, specific choice, be sure to calculate.