How Many Components AreThere in the Frame Scaffolding System
2.1.4 connecting bars
Gate Scaffolding for vertical pole connector assembly.
2.1.5 locking arm
Pull-over frame scaffold pole assembly joints.
2.1.6 cross-braced
Cross connection rod per two specimens gantry scaffolding.
2.1.7 horizontal frames
Engaging in the door scaffold rail horizontal member.
2.1.8 hanging scaffold board button
Engaging in the frame scaffolding crossbar.
2.1.9 adjustable base
Gate Scaffolding wherein the lower end plugged up, transfer to the foundation, and can adjust the height of the member.
2.1.10 fixed base
Frame Scaffolding wherein the lower end plugged up, transfer to the foundation, you can not adjust the height of the member.
2.1.11 adjustable bracket
frame scaffold pole plug on the upper end, following the upper load; and adjusting the height of the member.
2.1.12 fixed bracket
Door scaffold pole plug on the upper end, following the upper load, can not adjust the height of the member.
2.1.13 reinforcement
Lever for enhancing the stiffness of the scaffolding and set up (Figure 2.1. 3) includes scissors, horizontal reinforcement, sealing rod and sweep shot.
2.1.14 scissors
Located outside the scaffold, and the wall parallel to the cross bars.
2.1.15 horizontal reinforcement
And the wall parallel to the longitudinal horizontal rod.
2.1.16 Sealing bar
Connection bottom door step scaffolding pole horizontal bar lower end of the longitudinal member.
2.1.17 sweep shot
Connection bottom door step scaffolding pole horizontal bar lower end of the longitudinal member.
2.1.18 wall pieces
The scaffolding attached to the main building structure.
2.1.19 Step
The vertical distance along the scaffolding, gantry scaffolding between the two rails, a value Gate Scaffolding height of the connecting rod and collar height.