ADTO News
Here Are the Right Ways to Build Tubular Scaffoldings in the Project
During the construction of a scaffolding, build links is the key link, is related to the scaffolding use safety. Construction personnel should strictly in accordance with the construction specification, simplify the construction process, avoid the empiricism. Below we will introduce the basic process of erection of steel pipe scaffolding:
First, before the erection of steel pipe scaffolding, to inspect the steel pipes, fasteners and so on, must not use, cracks or corrosion of the fastener, and severe bending shelf, lest bring safe hidden trouble. Also check whether the ground is smooth, solid and reliable drainage measures.
Second, with the power cord and electrical equipment, want to accord with the related provisions on safe distance, prohibit disorderly pull wires on the scaffolding. And during the erection and dismantling to stop sending, and completes the safety measures.
Third, can not use steel, bamboo scaffolding. This is because the mix of scaffolding, node if the tie not easy to loose, causing the frame body appears to be out of shape. In this way, can meet the basic requirement for the scaffolding stability.
Fourth, the steel pipe scaffolding erection is completed, to the relevant person in charge of by the contractor after the inspection can be formally used. At the same time have someone who's in charge of routine inspections of scaffolding and scaffolding on a regular basis, so as to find problems in a timely manner to adjust in a timely manner.
Fifth, in the process of the erection, should also pay attention to the workers of their own safety, and good division of labor. After repeatedly every working procedure can be the next working procedure, grasp every construction details. Also note the erection materials cannot be put at random, prevent falling off.